Product Details:
Payment & Shipping Terms:
|
Place Of Origin: | Hubei ,China | Classify: | Air Suspension Chassis System |
---|---|---|---|
Function: | Distribution Solenoid Valve | Vehicle For: | L405 Range Rover |
Material: | Plastic Copper | Warranty: | 365 DAYS |
High Light: | L405 Range Rover Distribution Valve Blcok,L405 Range Rover Air Suspension Valve,2203200258 Air Suspension Valve |
Air Suspension Valve for L405 2013 Range Rover Sport L494 2014 Velar 2017 Discovery
Product Description
Air Suspension Valve for L405 2013 Range Rover Sport L494 2014 Velar 2017 Discovery
Fitment : L405 Range Rover
Reference OEM Number
LR070245, LR037081,LR037081
Delivery: 1-7 days for stock items, 30-60 days for production order
Material: Plastic ,Cooper
Package: Neutral Packing Or As Requirement
Item | Suspension distribution valve blcok |
Type | Distribution valve blcok |
Quality | OEM and excellent Quality |
OE NO. | 2203200258 |
HS NO. | 87088010 |
Car Model | L405 Range Rover |
Position | all position |
MOQ | 1 pcs |
Delivery time | 1-7 days for stock items, 30-60 days for production order |
Warranty | 1 Years |
Qty/Box | Boxs, cartons |
Payment | T/T, L/C |
Shipping | DHL, Fedex, TNT, By Air, By Sea (LCL cargo or full container shipping) |
Brand | TOPBO / OEM other brand |
Tips:
What happens if the Air Suspension Valve Control Unit failured?
If the Air Suspension Valve Control Unit failed, air may be leaked back to the compressor or the central
air reservoir. This can cause the vehicle to not maintain the ride height required. So the failed valve block
should be replaced asap.
It does not take very ling to replace this part and you can complete it by yourself !
Just follow these steps to complete the replacement:
1. Drain AIRmatic system using Diagnosis;
2. Remove compressor; Detach plug from AIRmatic pressure sensor;
3. Detach valve unit connector; Undo pressure line terminals;
4. Undo nuts (arrows) and remove level control;
5. Remove rubber buffer to level control valve;
6. Install in the reverse order; Fill AIRmatic system using Diagnosis;
7. Check AIRmatic for leaks.
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral package. But can also do what you need.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and all left balance before delivery. We'll show you the photos of the
products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 1-15 working days after receiving your advance payment. The specific
delivery time depends
on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and
fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay
the sample cost and the courier cost.
Shipping:
By Sea, by Air or by Express Company (DHL TNT Fedex etc) ,as customers' request.
We have stock in the warehouse, as soon as we receive your payment, we will arrange shipment promptly!
Contact Person: Ms. Vanness Cheng
Tel: +86 13986110544
Fax: 86-27-83666828